top of page
ChatGPT Image Apr 24, 2026, 10_19_47 PM.png
drawing backgrounds2.png

Foundations & Utilities

20250723_162544.jpg

Complete Foundations & Underslab Systems

20240130_091434.jpg

Water Connection Design, Permitting, Phasing, Temporary Service & Sequencing 

20231204_102543.jpg

Water Meter Vault

20251021_165951.jpg

Underground Electric / Data

drawing backgrounds5.png

New Vertical Construction

20250814_165457.jpg

Frame Construction

20260511_170254.MEDIUM.jpeg

Detailed Mechanical / Electrical / Plumbing (MEP) Coordination

Air & Vapor Resistive Envelope

Mechanical rooms that maximize living space while meeting energy code requirements.

drawing backgrounds3.png

Reconstructions

20231215_152307.jpg

Reconfiguration / Addition of Egress Doors

20230104_160827.jpg

Abatement Consultant & Contractor Selection & Coordination

20240202_140715.jpg

Exterior IBC egress staircase developed through structural and constructability evaluation of steel and timber systems.

20230122_141845.jpg

Removal of Bearing Walls, Flush Engineered Beams & Ceiling Height Increase

12-beaver-way-104-rochester-nh-03867 (1).webp

Completed Alteration to 4-Unit Multi-Family

drawing backgrounds4.png

High Quality  Interiors

3_1.jpg
12_1.jpg
12-beaver-way-101-rochester-nh-03867 (7).webp

Additional Infrastructure Experience

210,000 Gallon AWWA D103 Water Storage Tank

​

Turnkey delivery of a 210,000-gallon municipal water storage tank completed in a prior professional role, including procurement coordination, vendor management, site execution, chlorination, testing, and commissioning.

20191024_165938.jpg

Experience with municipal water infrastructure and storage systems informs KOZBRO’s approach to residential site development, utility coordination, and fire flow considerations in constrained or remote locations.

bottom of page